product

product category

Mobile Crusher

The Mobile Jaw Crushing Plant is not limited to the location of crushing operation, and it reduces the cost of material transportation.

View More

VSI Crushers

While most other crushers reduce rocks by pushing them by force against metal, VSI crushers also use the rock fed into the machine to crush itself.

View More
  • Giant Copper Mine Unblocked as Peru Awards Tia Maria

    2019-07-09· Tia Maria is expected to produce 120,000 tons annually. The market is currently expected to post a 189,000-ton deficit by the end of this year, according to the International Copper Study Group .

  • Southern Copper's Tia Maria Construction License Suspended

    2019-08-15· The Tia Maria mine is a large copper deposit located in the south of Peru in the province of Islay, Arequipa Region. The company had received the final approval of Tia Maria´s Environmental

  • 作者: Zacks Equity Research
  • Shaping the Digital Mine Southern Peru Copper

    2017-06-27· In the Peruvian Andes, Grupo Mexico and Southern Peru Copper Corporation, are applying Hexagon Mining technology with outstanding results. The company invited us to document this success story at

  • 作者: Hexagon Mining
  • What is Peru’s biggest environmental conflict right now?

    The answer, no about about it, is a proposed copper mine called Tia Maria in the Arequipa department in Peru’s south. Tia Maria has been one of the country’s main news stories over the last

  • Tía María copper project gaining legitimacy in Peru: exec

    Southern Copper’s Manager of Technical Services, Carlos Aranda, said this week that the $1.4 billion Tía María copper project, located in the southern Peruvian region of Arequipa, is gaining

  • Southern Copper Scraps Tia Maria Copper Project In Peru

    Southern Copper said it is canceling the $1.4 billion Tia Maria copper mine project in southern Peru due to ongoing protests and a lack of government support.

  • Protests in Peru against Tía María mining project enters

    Tía María is a large open-pit copper mine located in the Islay province, Peru. SCC claims that it will produce 120,000 tons of high-grade copper per year for 18 years. The mine project involves an investment of 1.4 billion USD. The construction of the mine

  • Tia Maria Mine, Islay Province, Arequipa, Peru

    Tia Maria Mine, Islay Province, Arequipa, Peru : Tia Maria is a copper mine project which will be including various mining concessions totaling 32,989.64 hectares. It is expected to produce 120,000 tons annually after starting production on Dec

  • Southern Copper to resume Tia Maria project in Peru as

    Southern Copper Corp (NYSE:SCCO), the world’s fifth largest producer of the red metal in terms of output, said Friday it hopes to soon resume work at its $1.4 billion Tia Maria project in Peru

  • Peru suspends key permit for Southern Copper in U-turn

    Peru on Friday suspended a recently issued construction permit for Southern Copper's Tia Maria mine, a project that has triggered violent protests by nearby residents.

  • UPDATE 2-Peru won't 'impose' troubled Tia Maria

    2019-10-30· Peru has given an important green light for Southern Copper Corp's much-delayed Tia Maria copper mine, but the government cautioned it would

  • Movimiento contra el proyecto minero Tía María en

    2019-07-17· Southern Peru Copper Corporation Proyecto Tia Maria Duration: 8:58. Southern Peru Copper Corporation 31,035 views. 8:58.

  • 作者: RT en Español
  • Tia Maria mine: troubles spill out across Peruvian

    Tensions over mining operations in Peru have once again flared up over the government's decision to green-light Southern Copper's plans for the Tia Maria mine. The return of violent clashes to the area between locals and police, which has resulted in four fatalities so far, threatens to put Peru

  • World Socialist Web Site wsws.org

    World Socialist Web Site where the open pit Tia Maria mine is located. the National Mining Council suspended for 120 days the license of the Southern Peru Copper Corporation,

  • Proyecto Tía María Wikipedia, la enciclopedia libre

    2020-06-08· Tía María es un proyecto minero localizado en el desierto La Joya, al norte de la ciudad de Cocachacra, en la provincia de Islay, región de Arequipa. La empresa Southern Perú Copper Corporation del Grupo México se encarga del proyecto desde el 2003 y contempla la construcción de dos minas denominadas “Tía María” y “La Tapada” para la recuperación de cobre mediante el sistema

  • Peru plans to give Southern Copper key permit for long

    The mine is slated to produce 120,000 tonnes of high-grade copper annually. If Southern Copper builds Tia Maria, it would mark a rare instance of reviving one of several proposed mines that have

  • Peru Approves Stalled Tia Maria Copper Mine Project

    Peru's government approved the environmental impact study for a $1.4 billion copper mine known as Tia Maria, a large-scale project that has been stalled for the last three years after local

  • List of mines in Peru Wikipedia

    2020-05-26· Las Bambas copper mine: copper: 19 Lily Mine: other 20 Los Chancas mine: copper: 21 Mantaro mine: phosphate: 22 Marcona mine: iron: 23 Morococha mine: silver: 24 Pallancata mine: silver: 25 Quellaveco mine: copper: 26 Río Blanco mine: copper: 27 Rio Huaypetue mine: gold: 28 San Rafael mine: other 29 Santa Ana mine: other 30 Tia Maria mine

  • SOUTHERN PERU COPPER CORPORATION ESTUDIO DE IMPACTO

    2010-04-19· 5375/R1 Southern Peru Copper Corporation Water Management Consultants A Schlumberger Company CONTENIDO Página 1 INTRODUCCIÓN 1-1 1.1 Antecedentes 1-2 1.2 Necesidad de la Elaboración del IEA 1-2 1.3 Objetivo 1-2 1.4 Descripción General del Proyecto 1-3